 |
Located
beside the Forge Pond section of the
Metedeconk River in Brick Township is the MUA's modern water treatment
plant. The plant, which has been expanded and upgraded, is now
capable of processing up to 16 million gallons of water a day. To
monitor the quality of water and ensure the public's safety, the MUA
operates an on-site, state certified, water quality testing laboratory,
which has been operating continuously since 1975. As part of the
water delivery sewage disposal operations, the authority controls and
maintains more than 700 miles of pipe, five water storage tanks and 27
sewage stations.
|